Plumbing

Shower enclosure and cubicle installation

Fitting a shower enclosure is half plumbing and half precision work: if the tray is not level, water pools in the corner and the silicone goes black within a year.

Price from
150 € per job
Response time
Routine work 24–48 hours, emergencies often the same day
Shower enclosure and cubicle installation

What the job includes

  • Levelling and fixing the tray or shower base
  • Connecting the waste and trap to the drain
  • Assembling and fitting the glass panels or cubicle
  • Sealing every joint with sanitary silicone
  • A pressure and water test before we leave

How we do it

We start by checking the floor and walls — in older buildings they are rarely square, and a cubicle has to be set out with that in mind. The tray goes on adjustable feet and is levelled in both directions. Sealing happens only once every connection is dry, and we ask you to leave it 24 hours.

Good to know

A budget cubicle is not a bad cubicle, but its profiles are thinner and want a more careful fit. If assembly is going to take longer we say so on the spot — that is an honest hourly charge, not a surprise on the invoice.

Frequently asked questions

Can you replace a bath with a shower?

Yes, one of the most common jobs we do. Removing the bath, moving the waste and re-tiling normally come with it — we quote all of it together.

How long before it can be used?

Silicone needs 24 hours. You can shower before that, but water should not sit on the joints.

Request a quote

Fill in the form or call us. The phone is answered around the clock; the form we answer within a couple of hours.

We use your details only to answer this request. See the privacy policy. →

Get a quote for this job

Write briefly what needs doing. We give the price before we come.

CallGet a quote