Finishing

Flooring: laminate, vinyl and parquet

A new floor is quick work when the subfloor is right. Most problems — creaking, gaps, planks that move — come from a subfloor that was never levelled.

Price from
15 € per job
Response time
Routine work 24–48 hours, emergencies often the same day
Flooring: laminate, vinyl and parquet

What the job includes

  • Lifting the old covering and taking it away
  • Checking and levelling the subfloor
  • Underlay and a vapour barrier where needed
  • Laying laminate, vinyl or parquet
  • Skirting boards, thresholds and corners

How we do it

We measure the subfloor deviation with a two-metre straightedge: more than 3 mm over two metres means levelling. The material has to acclimatise in the room for at least 48 hours before laying — that is a manufacturer's warranty condition, not a suggestion. We always leave an expansion gap at the wall, even where the skirting would hide the lack of one.

Good to know

Ordinary laminate does not belong in a bathroom or kitchen, 'moisture resistant' included. There we recommend vinyl plank or tile — otherwise the edges curl within a year.

Frequently asked questions

Can it go over the old floor?

Often yes, if the old covering is firmly down and flat. Never over carpet or a soft underlay.

How long does a 40 m² flat take?

Usually two days: levelling and preparation on the first, laying and skirting on the second.

Request a quote

Fill in the form or call us. The phone is answered around the clock; the form we answer within a couple of hours.

We use your details only to answer this request. See the privacy policy. →

Get a quote for this job

Write briefly what needs doing. We give the price before we come.

CallGet a quote