What to tell your apartment association before renovating
The Abimeister team · Updated · 5 min read
Getting a building permit sorted, if one is needed, is only part of preparing for a renovation. Living in a block of flats means sharing walls, a lift, a stairwell and pipework with your neighbours, and most of the friction during a renovation comes from ordinary things nobody thought to mention beforehand. This guide covers what to tell your apartment association board, when you may make noise, how to use the lift and stairwell, where waste goes, and what happens when your work touches shared risers.

Who to inform, and when
Even a modest renovation is worth mentioning to your korteriühistu board before you start, ideally by email so there is a written record. Say what you are doing, roughly how long it will take, and whether contractors will need access to shared spaces or systems.
Boards vary in how formal they want this. Some ask for a short written notice for anything beyond redecorating; others are happy with a message in the building's chat group. If you are unsure, ask the board chair directly rather than guessing, since expectations differ from one building to the next.
Telling the board early also means they can warn immediate neighbours, which heads off most complaints before they start. It costs nothing and saves you awkward conversations later.
What times noisy work is allowed
There is no single national rule fixing exact hours for drilling or hammering in a block of flats; it is usually set out in the building's house rules (kodukord), which the board can send you. Where the building has no written rule, the sensible default followed across Tallinn is weekdays during normal working hours, avoiding early mornings, evenings and Sundays.
Even within allowed hours, warn the flats directly above, below and beside you before drilling into a wall or floor, especially in panel buildings where sound travels through the structure rather than the air. A short note through the door goes a long way.
If a job is going to be genuinely loud for more than a day or two, such as removing a screed floor, say so in your notice to the board and give a rough end date so neighbours can plan around it.
Using the lift and stairwell for materials
Carrying tiles, plasterboard or a bag of cement up a stairwell is where most accidental damage happens, from scraped paint to a jammed lift door. Ask the board whether the building has protective covers for the lift floor and walls, and use them, or bring your own moving blankets.
Large or heavy loads put real strain on an older lift, particularly in Soviet-era panel blocks where the mechanism was not built with renovation traffic in mind. For a full kitchen or bathroom refit, check with the board whether the lift has a weight limit or whether stairs are preferred for the heaviest items.
Book a time slot for the lift if other residents might need it, and always prop doors rather than letting them slam under a load of materials.
Getting rid of waste and building rubble
General household bins are not for construction waste, and putting rubble or old cabinetry into them is one of the fastest ways to annoy both neighbours and the board. Estonia's waste stations accept construction debris, but for anything more than a few bags it is usually simpler to order a skip or a one-off collection.
Ask the board where a skip may be placed, since parking spaces and access routes are often reserved or restricted by house rules. For a short job, our odd jobs service, from 39 € an hour, can include hauling waste down and out without you needing to hire a skip at all.
- Old kitchen units and cabinetry: waste station or skip, not the bin room
- Tiles, screed, plaster rubble: skip or a construction waste collection
- Paint tins and solvents: hazardous waste point, never poured down a drain
- Packaging and cardboard: normal recycling, broken down flat
- Anything left in a stairwell overnight: check house rules first
Shared risers and building systems
Water, heating and ventilation risers running through your flat usually belong to the building as a whole, not to you alone, even though they pass through your walls. Before boxing one in, moving a radiator, or connecting a new bathroom fitting, tell the board, since access for future repairs or a whole-building leak needs to remain possible.
If your renovation involves shutting off a riser, even briefly, other flats on the same stack will lose water or heating too, so the board needs enough notice to inform them and, where relevant, to arrange for someone competent to isolate it correctly.
Our plumbing service, from 45 € an hour, regularly handles exactly this kind of work: isolating a riser correctly, doing the job, and leaving the shared system in a state the next repair can still get to.
When the work is small and needs no permit
Repainting, changing flooring within a room, replacing a kitchen without moving plumbing, or swapping fittings like taps and light switches generally need no permit and no building register entry. Even so, a short heads-up to the board about noisy days and any lift use is good practice and costs you nothing.
For jobs at this scale, many people ask us to handle the whole thing as a flat renovation package, from 180 € per job, which includes the coordination of noise timing, materials and waste as part of the price rather than something you have to think about separately.
When the renovation is larger and needs a plan
Moving a bathroom, changing the layout of a flat, or altering anything touching the building's structure or shared systems usually needs a permit or at least a notice to the building register, which is covered in our separate guide on permits. In these cases the board's involvement goes beyond courtesy: they may need to approve access, coordinate with other owners on the same riser, or confirm the change does not conflict with the building's plans.
We do not work on load-bearing walls or gas installations, and any larger job of this kind should go through a specialist for that part of the work, with the city or the building register consulted to confirm what is required before anything is opened up.
Tell your board early, keep noisy work within sensible hours, protect the lift and stairwell, and give notice before touching any shared riser.