Budgeting finishing work for a flat: where the money goes
The Abimeister team · Updated · 6 min read
Two flats of the same size can end up with renovation bills that differ by thousands of euros, and the difference is rarely the builder. It comes from the state of the walls underneath, the materials chosen, the age of the building, and how much of the work is hidden until someone opens a wall or lifts old flooring. This guide walks through where the money in a typical Tallinn flat renovation concentrates, so you have a realistic frame before you start requesting quotes.

Why two similar flats can cost very different amounts
A Soviet-era panel flat and a 1930s wooden house flat in Kalamaja can look equally tired on the surface and still need completely different budgets. Panel buildings usually have flatter walls and concrete floors, which makes preparation faster. Old wooden houses often have uneven walls, old plaster that needs stripping back, and floor joists that need checking before anything new goes down.
Access also matters more than people expect. A flat with a lift and a parking spot near the entrance costs less to work in than a fourth-floor walk-up in the old town where materials have to be carried up by hand. If a building has a working goods lift or wide stairwell, that alone can shave hours off a job.
The other variable is what is already there. Renovating a flat down to bare concrete costs more in labour but gives a predictable result. Working around existing finishes — patching plaster instead of replacing it, laying new flooring over an old subfloor — can be cheaper, but only if that subfloor is actually sound, which is not always obvious until it is opened up.
Walls and ceiling — the largest share of most budgets
Walls and ceilings usually take the biggest slice of a finishing budget, simply because there is so much surface area and so much of the cost is labour, not material. Filling cracks, sanding old paint, priming, and applying two coats takes real time even in a small room, and old plaster in prewar buildings often needs more preparation than new-build walls do.
Paint itself is a modest cost per litre; the labour to prepare the surface properly is what the price mostly reflects. A ceiling with old distemper or a wall with years of nicotine staining needs extra priming coats before colour goes on, and that is time you pay for even though the finished wall looks the same as one that needed less prep.
For a room-by-room repaint or wall repair, our painting and decorating work starts from 12 € per job, priced once we know the condition of the surfaces and the square metres involved. It is worth asking for that assessment early, since wall condition is the single biggest swing factor in a finishing budget.
Floors — material cost matters more than the labour
Flooring is the one area where what you choose affects the bill more than who lays it. Laminate, vinyl click flooring, and engineered timber all sit in different price brackets before a single hour of labour is counted, and the gap between the cheapest and the better options can be larger than the fitting cost itself.
The subfloor decides how much preparation is needed. Concrete floors in panel flats usually need self-levelling compound if they are uneven, which adds material and drying time before flooring can go down. Old timber floors in wooden houses sometimes need boards replaced or re-secured first, and that is labour you cannot skip without risking a floor that creaks or flexes later.
Underfloor heating, common in newer developments, adds a layer of care: flooring has to be rated for it, and adhesives or underlays need to be compatible. Our flooring work starts from 15 € per job, with the final figure depending on the material you choose and the state of the subfloor underneath.
The bathroom — a small room with the widest price range
Per square metre, a bathroom is usually the most expensive room to finish, and also the one where quotes vary the most. Waterproofing has to be done properly before tiling starts, tiling itself is slow, precise work, and plumbing and electrical connections both need a qualified tradesperson rather than general labour.
The width of the price range comes from what is behind the tiles as much as what is on them. Replacing an old bathroom down to the pipework costs considerably more than retiling over sound waterproofing and existing plumbing runs. In older buildings, pipes sometimes need attention regardless of the finishing plan, which is worth checking before you fix a budget.
We do not do gas work, and if a bathroom renovation touches a load-bearing wall that separates it from another room, that part goes to a structural specialist. Electrical work in a bathroom, such as moving a socket or a light fitting, is carried out by a qualified electrician as part of the job.
Doors and the small details a budget often misses
Internal doors, skirting boards, architraves and door furniture rarely make it into an initial budget sketch, yet they add up across a whole flat. A door that needs rehanging or a frame that needs adjusting after floor levels change is a short job on its own, but multiplied by every room it becomes a noticeable line item.
Small fixtures fall into the same trap: curtain rails, shelving, cabinet handles, a new letterbox or door lock. Each one is quick and inexpensive individually, which is exactly why they get left out of early estimates and then show up as extras once the main work is underway.
It helps to walk through the flat room by room and list every door, socket cover, and fitting that will need replacing or adjusting, rather than budgeting only for walls, floors and the bathroom. A short punch list like this is what separates a quote that holds from one that grows.
- Internal doors: rehanging, adjusting, or replacing
- Skirting boards and architraves
- Door handles, locks and hinges
- Curtain rails and blinds fixings
- Socket and switch covers
- Letterbox, doorbell, small hardware
Building a realistic budget before you ask for quotes
Start with hourly work if the scope is small and well defined — our rates begin at 39 € an hour, minimum one hour then in 30-minute steps, with a 25 € call-out within Tallinn that is deducted from the bill if the work goes ahead. For anything larger, a fixed quote based on a description or photos is more useful, since it gives you one figure valid for 30 days rather than an estimate that can drift.
For a fuller renovation covering several rooms, our flat renovation service starts from 180 € per job, priced once we understand the scope, and it is the more sensible route once the work spans walls, floors and a bathroom together rather than one room at a time.
Decide early whether you or the tradesperson buys materials. Materials we source carry a 10 % handling fee, which is often worth it for convenience and correct quantities, but buying tiles or flooring yourself is a straightforward way to control that part of the cost directly.
Build in a margin beyond the quote for the unknowns — what is behind an old wall, what a lifted floorboard reveals — rather than assuming the first number you see will be the last one.
Walls and the bathroom usually decide the size of a flat renovation budget, so get those assessed properly before fixing a figure for the rest.